DATA |
SOURCE |
DATE |
Quality Assurance Project Plan for Eighteenmile Creek PCB Source
Trackdown Project |
Ecology & Environment Inc. |
December 2005 |
Evaluation of Sediment Quality of the Erie Canal between the Niagara
River and Rochester |
New York State Canal Corporation |
January 2000 |
Chemical Contaminants in Sediments of NY Tributaries to Lake Ontario |
NYS DEC Division of Water |
October 1988 |
Eighteenmile Creek
Sediment Study-Final Report |
NYS DEC Division of Water |
December 2001 |
Trackdown of Chemical Contaminants to the Niagara River from Buffalo,
Tonawanda, and North Tonawanda |
NYS DEC Division of Water |
April 1996 |
Eighteenmile Creek Great Lakes AOC Concentrations, Bioaccumulation, and
Bioavailability of Contaminants in Surface Sediments-Draft |
US Army Corps of Engineers, Buffalo District |
September 2006 |
Sediment Sampling, Biological Analyses and Chemical Analyses for
Eighteenmile Creek AOC- Volume 1: Project Overview |
US Army Corps of Engineers, Buffalo District |
March 2004 |
Sediment Sampling, Biological Analyses and Chemical Analyses for
Eighteenmile Creek AOC- Volume 2: Laboratory Reports |
US Army Corps of Engineers, Buffalo District |
March 2004 |
An Investigation of the Dioxin/Furan Concentrations in the Sediments of
Eighteenmile Creek and the Erie Canal near Lockport, NY |
NYS DEC Division of Water |
June 1994 |
Summary of Detected Sediment Sample Analytical Results Compared to Human
Health Bioaccumulation |
URS |
April 2005 |
Scope of Work-Eighteenmile Creek Sediment Investigation, Upstream of AOC |
US Army Corps of Engineers, Buffalo
District |
September 2006 |
Technical Guidance for Screening Contaminated Sediments |
NYS DEC Division of Fish, Wildlife & Marine Resources |
November 1993 |
Eighteenmile Creek Corridor: NYS barge Canal to North Transit Road Site
Investigation Scope of Work |
NYS DEC |
February 2004 |
Sampling Report: Former Flintkote Plant Site, Lockport NY |
NYS DEC Division of Environmental Remediation |
June 2002 |
Sampling Report: Water Street Properties, Lockport NY |
NYS DEC Division of Environmental Remediation |
March 2003 |
Remedial Investigation Report:
Eighteenmile Creek Corridor, Lockport NY |
NYS DEC Division of Environmental Remediation |
September 2006 |
Memorandum-Conceptual Approval Memo for Proposed Engineering Standby
Contract Work Assignment |
NYS DEC Division of Environmental Remediation |
August 2006 |
Eighteenmile Creek Great Lakes AOC
Concentrations, Bioaccumulation, and Bioavailability of Contaminants in
Surface Sediments |
US Army Corps of Engineers, Buffalo District |
September 2006 |
Nutrient and Soil Losses from the
Eighteenmile Creek Wateshed |
SUNY Brockport |
August 2006 |
Sediment Modeling for the Eighteenmile
Creek Watershed |
Shreeram Inamdar, PhD, SUNY Buffalo |
December 2005 |
Sediment Quality Paramenters and Sampling Requirements |
NYS DEC |
2002 |
Areas of Concern/Sediments-Appendix 1 |
U.S.E.P.A |
2006 |
Final Report for Eighteenmile Creek PCB
Source Trackdown Project, Niagara County NY |
Ecology & Environment Inc. |
January 2007 |
Eighteenmile Creek/Olcott Harbor Sediment Study-1994 Summary Results |
NYS DEC Division of Water |
October 1998 |
Scope of Work-Eighteenmile Creek Sediment Investigation, Upstream of AOC |
US Army Corps of Engineers |
November 2007 |
Site Investigation Report-Old Upper Mountain Road Site |
NYS DEC Region 9 |
December 2007 |
Field Data Report-Eighteenmile Creek Sediment |
U.S.E.P.A |
2008 |
Remedial Investigation of Contaminated Sediments in the Eighteenmile
Creek Source Area of Concern |
U.S.E.P.A-GLNPO |
April 2008 |
Technical Report Hydrographic Survey and Sediment Probing Eighteenmile
Creek-Burt, NY |
CH2M Hill/Aqua Survey Inc |
June 2009 |
Phase 1 Reconnaissance Survey, Eighteenmile Creek AOC |
U.S.E.P.A |
July 2009 |
Region 5 RAC2 Quality Assurance Project Plan Revision 3-Remedial
Investigation/Feasibility Study Eighteenmile Creek AOC |
CH2m Hill, Ecology & Environment Inc, Environmental
Design International Inc, Teska Associates Inc. |
November 2009 |
Region 5 RAC2 Field Sampling Plan-Remedial Investigation Eighteenmile
Creek AOC |
CH2m Hill, Ecology & Environment Inc, Environmental
Design International Inc, Teska Associates Inc. |
November 2009 |
Results from the Sampling of Erie Canal Suspended Sediments and Creek
Waters for PCBs-Eighteenmile Creek Corridor Site No. 932123 |
NYS DEC Division of Environmental Remediation |
October 2010 |
HRS Documentation Record-Eighteenmile Creek |
U.S.E.P.A |
September 2011 |
Record of Decision-Eighteenmile Creek Corridor Site-Operable Unit Nos.
1,3,4,5, and 6- State Superfund Project Site No. 932121 |
NYS DEC Division of Environmental Remediation |
March 2010 |
Olcott Harbor Sediment Sampling Plan, Town of Newfane NY |
Wendel Engineers |
April 2013 |
Olcott Harbor Contaminant Determinations |
US Army Corps of Engineers, Buffalo District |
November 2013 |
Trackdown of Chemical Contaminants to Lake Ontario from New York State
Tributaries |
NYS DEC Division of Water |
April 1996 |
Dioxin/Furan in Lake Ontario Tributaries 1995-1997 |
NYS DEC Division of Water |
1995-1997 |
Draft Eighteenmile Creek Powdered Activated Carbon (PAC) Pilot Study
Report |
Ecology and Environment Inc. |
December 2012 |
Summary Report for PCBs Detected in Barge Canal Sediments During
Investigation of NYSEG |
URS |
May 2006 |
Eighteenmile Creek Great Lakes AOC Concentrations, Bioaccumulation, and
Bioavailability of Contaminants in Surface Sediments |
US Army Corps of Engineers, Buffalo District |
June 2008 |
Olcott Harbor Sediment Sampling Results |
Wendel |
January 2014 |
Technical and Operational Guidance Series (TOGS) In-Water and Riparian
Management of Sediment and Dredged Material |
NYS DEC Division of Water |
November 2004 |
Screening and Assessment of Contaminated Sediment |
NYS DEC Div of Fish, Wildlife & Marine
Res. |
June 2014 |
Fine-Grained Sediment within Olcott Harbor, Eighteenmile Creek, NY |
US Army Corps of Engineers, Buffalo District |
March 2018 |